Up Geographical Database for photos, videos, GPS Coordinates, news, and project descriptions. » Cayman Island Reef Ball Projects and Photos » Cemetary Reef Project » The Spurlino Foundation Nearshore Reef Rehabilitation Project » Spurlino Foundation Construction Training Project Prev Next Slideshow

 Previous image  Next image  Index page
toddcemetaryt051
kcspicst037
jasonfinaldayt037
kcspicst036
jasonfinaldayt039
  jasonfinaldayt038.jpg - After 50 pounds of microsilica, 1/2 pound of polyethelyine fibers and a 1/2 gallon of high range water reducer were added (one yard concrete volume)  to the truck....we do a test pour into a wheel barrel to see if the conrete is the right "slu,p" [slump is a measure of concrete liquidity].  
jasonfinaldayt040
jasonfinaldayt041
jasonfinaldayt042
jasonfinaldayt043
jasonfinaldayt044

jasonfinaldayt038 | After 50 pounds of microsilica, 1/2 pound of polyethelyine fibers and a 1/2 gallon of high range water reducer were added (one yard concrete volume) to the truck....we do a test pour into a wheel barrel to see if the conrete is the right "slu,p" [slump is a measure of concrete liquidity]. Download
Total images: 61 | Help
All images are copyrighted by Reef Ball Foundation 1993-2010 and pemission from reefball@reefball.com is required for use.